Skip to content

General contractors and subcontractors

From the first submittal to the last lien waiver, one job file.

Every RFI, change order, certificate and waiver filed to the right job and subcontract, routed to the right approver, and complete at closeout.

The paperwork one construction project produces, phase by phaseOne project from buyout to closeout. Subcontracts and insurance certificates arrive during buyout, with certificates renewed mid-job. Submittals and RFIs cluster early in construction, daily logs run every day, certified payroll every week, pay applications and lien waivers every month, and change orders arrive as needed. The closeout package comes last and is complete when every piece is in.PRECONSTRUCTION AND BUYOUTSubcontractsone per subInsurance certificatesper sub, renewed yearlyW-9sone per vendorCONSTRUCTIONSubmittals and RFIsas neededDaily logsevery dayCertified payrollevery weekPay apps and lien waiversevery monthChange ordersas neededCLOSEOUTO&M manuals, warrantiesper systemAs-built drawingsfinal setFinal lien waiversone per sub
One job's paper, by phase and cadence. Each piece is a document somebody has to file, route or chase.

Four people own most of a job's paper.

Project engineer or document controller

RFIs out and answers back, submittals logged and sent to the architect, transmittals for every set, and the current drawings in the field.

RFIs, submittals, shop drawings, transmittals, meeting minutes

Superintendent

A daily log every day, inspection sign-offs, delivery tickets, and a safety meeting sign-in sheet that has to end up somewhere other than the truck.

Daily logs, inspection reports, delivery tickets, toolbox talk sign-ins

Project accountant

The pay app to the owner, pay requests from every sub, and no check without a lien waiver and a current insurance certificate.

Pay applications, sub invoices, lien waivers, insurance certificates, W-9s

Payroll administrator

On prevailing wage jobs, a certified payroll every week for every crew, signed, and from every sub on the job too.

Certified payroll reports, statements of compliance, timesheets

Where jobs lose money on paper

It is never the whole job file. It is one page of it.

Submittal 08 71 00, Rev B

Door hardware was approved on Rev B. The copy in the trailer was Rev A. The installer built from the trailer.

Insurance certificate, drywall sub

The certificate on file expired in March. The crew was on site in April. Nobody knew until there was a claim.

Final waiver, second-tier supplier

Final payment and retainage wait on one supplier’s unconditional final waiver that is in someone’s email.

Certified payroll, week 23

The agency asks for the full run of payrolls. Week 23 is missing, and payments can be withheld until it turns up.

Content Central on the job

Change orders and submittals that route themselves.

A change order is filed to its job the moment it arrives, scanned in the trailer or emailed by the owner's rep, and its approval starts on its own. Small ones go to the project manager. Larger ones go on to operations. A stage that waits too long escalates, so nothing sits in an inbox while the work goes on.

When the last approver signs off, their saved signature is stamped on the change order and the signed copy is filed as a new version. Every decision, note and date is in the document's history.

Submittals and drawings use check-out and check-in. Only one person revises at a time, every earlier revision stays in the version history, and the copy everyone opens is the current one, so the field builds from the right set.

How routing by amount is set up
How a change order routes itselfA change order is filed to its job and starts an approval. If it is $25,000 or less, the project manager approves it. If it is more, the project manager and then the operations manager approve it. A stage waiting more than three days escalates. On final approval the approver's signature is stamped on the change order, it is filed to the job, and its data is exported for job costing.ARRIVESChange order 014, Job 2417Scanned or emailed, filed to the jobAmount over$25,000?NoYesSTAGE 1ProjectmanagerSTAGE 1ProjectmanagerSTAGE 2OperationsmanagerON FINAL APPROVALSignature stamped on the change orderFiled to Job 2417, every version keptTHENIts data exported for job costingAny stage waiting 3 days escalates.
Content Central approvals. The threshold, stages and deadline are yours to set.

No sub on site with an expired certificate.

Each certificate of liability insurance is filed to its subcontract with the policy expiration date as a field. One rule watches the date and emails the project accountant and the project manager 30 days ahead, while there is still time to get the renewal.

Job 2417 · insurance certificates

Rule: 30 days before expiration

Illustrative insurance certificate status by subcontractor
TradeExpiresStatus
ConcreteSep 30Current
ElectricalJul 15Current
DrywallJun 1Reminder sent
RoofingMay 20Reminder sent

Illustrative trades and dates.

Closeout, one subcontract at a time.

Set up a closeout file once: the documents every sub owes at the end, keyed on the subcontract number. Each sub's file fills itself as paper arrives and shows what is still missing. A scheduled report lists every sub with an incomplete closeout, and when the owner wants the package, each file merges into one PDF.

Subcontract 2417-09

3 of 5 in

Mechanical closeout

  • Final unconditional lien waiver (in)
  • Warranty letter (in)
  • O&M manuals (in)
  • As-built markups (missing)
  • Attic stock transmittal (missing)

An illustrative closeout file. Your spec sets the list.

CapturePoint 6 in the job trailer

The stack from the trailer, sorted before lunch.

Feed it a week of mixed paper. CapturePoint 6 splits the stack into documents, works out what each one is and reads it. Point it at a folder of your own supplier invoices, purchase orders, certificates of liability insurance, daily logs, lien waivers or certified payrolls and it finds the fields by itself.

Every line item on an invoice is read and the math is checked, so a line that does not add up is caught before it is paid. Its AI runs on the PC, and finished files go to Content Central, a job folder, or SharePoint and OneDrive.

No sign-up. Download it and start using it today.

A money field read from printed text and saved as $207,420.79
CapturePoint 6, sample data: a total read from the printed page and saved as a money value, $207,420.79.

A worked example

Pay app week on Job 2417.

  1. Day 20

    Pay requests arrive.

    Subs email pay requests, conditional waivers and certified payrolls. Content Central picks them up from the shared mailbox; the trailer stack goes through CapturePoint 6.

  2. Day 21

    Each sub’s request checks itself.

    Each request files under its subcontract and pay period. Missing the waiver or the certified payroll? It shows Incomplete, and the report lists every sub still owing paper.

  3. Day 22

    Approvals route by amount.

    Sub invoices go to the project manager, larger ones on to operations, with a deadline on each stage.

  4. Day 25

    The pay app goes out complete.

    The approved backup merges into one PDF for the owner. Invoice data exports to QuickBooks, Sage or Epicor.

The rules that make a job file worth keeping.

Your counsel and your contracts set the details. Content Central keeps each document type on the retention schedule you set, and holds anything under a claim for as long as it takes.

01

Davis-Bacon and related acts

Federally funded and assisted jobs

Contractors and subs submit certified payroll weekly and keep payroll records for at least three years after the work is complete. Many states run their own prevailing wage rules.

02

State mechanics lien laws

Every job

Lien rights, notice deadlines and waiver forms are set state by state, and some states prescribe the exact waiver wording. Conditional and unconditional, progress and final, each is its own document.

03

OSHA recordkeeping (29 CFR 1904)

Employers required to keep injury logs

The OSHA 300 log, the 300A summary and 301 incident reports are kept for five years after the end of the year they cover.

04

Statutes of repose

Completed projects

Defect claims can come years after substantial completion, on a clock set by your state. The project record is your defense, so keep it whole.

05

Your subcontract terms

Every sub

Insurance minimums, additional insured endorsements and certificate requirements live in the subcontract. A current certificate on file is how you prove they were met.

Free live demo

Bring a real closeout package. We will show you what is missing from it.

Book a free demo and we will show you around, answer your questions and run your real paperwork through it. No cost, no pressure.

  • A live tour of the products that fit your work
  • Your own documents, set up and shown working
  • Your workflow and process, mapped with you
  • Straight answers from people who build it
Engraved illustration: file boxes, a document scanner and a PC at a desk